Type
Location
Description
Time
incident
I-285Southbound
One lane blocked due to debris on road on I-285 Southbound after Exit 34 Chamblee Tucker Rd.
incident
I-85Southbound
Three lanes blocked due to incident on I-85 Southbound at Exit 87 GA-400.
incident
US-280None
Crash on US-280 at CR-248.
construction
GA-190both ways
Road closed due to construction work on GA-190 both ways from GA-85-ALT White House Pkwy to US-27-ALT Broad St.
construction
Pannell Rdboth ways
Road closed due to construction work on Pannell Rd both ways between Pleasant Valley Rd and Old Monroe Madison Hwy.
construction
GA-92both ways
Closed to high sided vehicles on GA-92 both ways between Cave Springs Rd and GA-92.
construction
Elm Stboth ways
Road closed due to construction work on Elm St both ways between Long St and Derrick St.
construction
Niskey Lake Rdboth ways
Closed to high sided vehicles on Niskey Lake Rd both ways between GA-154 Campbellton Rd and New Hope Rd.
construction
Dan Stribling Rdboth ways
Road closed due to construction work on Dan Stribling Rd both ways from GA-74 to Huel Brown Rd.
construction
Oak Hill Rdboth ways
Closed to commercial vehicles due to new road layout on Oak Hill Rd both ways between Chapel Hill Rd and GA-166.
construction
US-27Southbound
Road closed due to construction work on US-27 Southbound in West Bremen.
construction
GA-42both ways
Road closed due to construction work on GA-42 Druid Hills Rd both ways between Druid Hills Dr and GA-13 Buford Hwy. Detour in operation - I-85 northbound to Exit 91, SR 155/Clairmont Road, and then turn onto SR 13/Buford Highway.
construction
GA-400 SSouthbound
Exit ramp from GA-400 Southbound to Glenridge Conn Ne Northbound closed due to construction work. Detour in operation.
construction
I-85 Exit 79Northbound
Exit ramp from I-85 Exit 79 Northbound to 20th Ave Southbound closed due to construction work. Detour in operation - Exit 77/Fob James Dr. or Georgia Exit 2 / GA-18..
construction
I-85Westbound
Entry ramp to I-85 Westbound at Exit 79 from S Broad Ave Southbound closed due to construction work. Detour in operation - Georgia Exit I-85 Exit 2 / GA-18..
construction
Pine Hill Drboth ways
Closed to high sided vehicles due to new road layout on Pine Hill Dr both ways from Cherokee St to Duncan Dr.
construction
Baxter Stboth ways
Single alternate line traffic due to sewer works on Baxter St both ways from Collins Ave to Baxter Dr.
construction
Bankstone Drboth ways
Road closed due to construction on Bankstone Dr both ways from Clintwood Dr to GA-360 Macland Rd.
construction
County Line Rdboth ways
Closed to high sided vehicles on County Line Rd both ways from Riley Rd to Yates Dr.
construction
GA-77-SPURboth ways
Road closed due to construction work on GA-77-SPUR Cokesbury Hwy both ways from Coldwater Creek Rd to Flat Rock Rd.